Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8937

Re: material no,storage location,backflush activation in BOM

$
0
0

Hi Rampreet,

For using of cs20, i need to cretae the replacement material (i.e y,z,a,b,c,d). as per your idea while creation  of material in mm01. To extend the storage location and backflush in mrp2 view. for the material type : UNBW (Non-valuated material) the MRP2 Views are not extended,when i am searching the views for other UNBW Materials (Which are already created ). Now is it right to extend the views of MRP2, MRP3 (Availability check is askin as mandatatory,while trying in quality) for the newly created UNBW Material? Because already created UNBWmaterials are having the following views

Basic data1,2

general plant data/storage 1,2

plant stock

storage location stock.

 

To get the storage location, backflush to the BOM Component, i need to extend the MRP2 View. Please suggest me is there any problem,if MRP2 is extend to the present created material (UNBW). Becasuse in already created UNBW Materials are not having the MRP2 View. while creation in quality,it is asking the procurement type also,without giving the procument tab,it is not allowing to save.please guide me.

Regards,

Mastan.


Viewing all articles
Browse latest Browse all 8937

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>