Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8937

Re: SAP b1 integration error

$
0
0

Hi Nagarajan,

 

Thanks for that.

 

Based on

  • Solution 1
    To let the integration framework deploy the IPO step instance, for each affected SLD entry, choose Edit and then Save

     

    -This is the error message that i get when I apply Solution 1 :

    Untitled.png

 

Tried all the solution below, but it's not working.

 

1.5 Error HTTP 500 – Internal Error

  • Root cause 1: The dashboard is not deployed correctly in B1ic for the selected company or may have encountered an error.
  • Solution 1a: Ensure the correct company database appears in the SLD. Deactivate and re-activate the dashboard in SAP Business One’s General Settings.
  • Solution 1b: Check the Message Log in the Integration Framework -> Monitoring for errors (Failure) connected to “Sender Trigger / Object” “500” (event to create SLD entry) or “120000008” (event to deploy dashboards)
  • Solution 1c: Check the Queue Monitor in the Integration Framework -> Monitoring for pending processes – after installation / upgrade some post-installation processing time may be required (depending on various factors up to 2 minutes per B1 DB on slow systems)
  • Solution 1d: Go to the B1iP Control Center -> Maintenance -> IPO-Step Status and check “Deactivated steps only to check whether any processes are halted. If so, the relevant error may be displayed – giving a hint for details that require fixing.Activate the deactivated steps – and press “Refresh” to see whether the steps can successfully be reactivated.

1.6 Error “The IPO-Step to create a cached authentication config-node for is not known”

  • Root cause 1: Installation did not install the systems in the System Landscape directory.
  • Solution 1: Run the EventSender setup. Or detach the database from SQL Server Management Studio. Refresh company list and attach the database once again in SQL. Click refresh in the Choose Company window in SAP Business One.
  • Root cause 2: Scenario has not been activated
  • Solution 2: Open the Integration framework -> Scenarios -> Scenario Package Control. For the sap.Xcelsius click Activate.
  • Root cause 3: Changes made without restarting.
  • Solution 3: If changes are made ensure Integration Service and Event Sender are restarted.
  • Root cause 4: Internal functions / IPO steps may have been “deactivated”.
  • Solution 4: Go to the B1iP Control Center -> Maintenance -> IPO-Step Status and check “Deactvated steps only” to check whether any processes are halted. If so, the relevant error may be displayed – giving a hint for details that require fixing. Activate the deactivated steps – and press “Refresh” to see whether the steps can successfully be reactivated.

 

Any ideas will be greatly appreciated.

Thanks!

 

Regards,
Darius


Viewing all articles
Browse latest Browse all 8937

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>