Hi Rabi
Check the break that you have configured. May be you have configured it as a paid break and thus the planned hours are being considered as 9.5.
In the break schedule, update the 1.30 hours in the unpaid column.
Hi Rabi
Check the break that you have configured. May be you have configured it as a paid break and thus the planned hours are being considered as 9.5.
In the break schedule, update the 1.30 hours in the unpaid column.