Hi Krishnareddy,
thanks for your inputs.
It is so up to some point. Aim is to have always PO reference when posting with MIRO, because this leads through approval stage. In case you post without PO ref, then no approval is required.
The solution in here is going to be temporary. After sometime, we will introduce approvals for MIRO direct GL/material posting.